Sunday, September 19, 2010

Today John and I got about half of what we planned done but at lease we are half done, right?
We started with hooking up the brake lights to the ignition switch so they wont stay on after engaging the line lock brake. Then John hook up a kill switch to the coil and fuel pump.
I jacked up the car and took off the front wheels so John can take them and get them sandblasted and put the newer tires on. After all that I went ahead a jacked up the rear and John adjusted the clutch so it wouldn't grind when going into gear. Oh yeah i also wire wheeled and painted the inside trim for the front and rear windshield.
Next we still have to get the tires back and put on, wheel alignment, and fix the windshield trim and that should just leave body work for last. The main thing is just to get it on the road and worry about body work as i drive it.

No comments:

Post a Comment